One day, for most single-suction systems in a basement or slab house. Stone foundations, crawl-space membranes, and houses needing two suction points can stretch to a second day. The verification retest afterward runs at least 48 hours.
More detail
The visible work is the short part. Before install day comes the foundation survey: walking the basement, mapping foundation types, and running a communication test wherever nobody knows what sits under the slab, which in Pittsburgh's patched pre-war floors is most of the time. That visit produces the fixed written quote. After install day comes the verification test, which cannot be rushed; a short-term test needs its full window under closed-house conditions before anyone signs off on the number. If a closing date drives your schedule, say so in the first call, and the sequence gets planned backward from the deadline the way our real estate radon service runs every transaction job.