Yes. Stone-foundation houses from the 1900s to 1940s mitigate successfully across Pittsburgh every week. They need more sealing, careful suction-point placement, and sometimes a second suction point, which is why they price toward the top of the range.
More detail
A stone wall cannot be sealed joint by joint, and a good design never tries. The system works from the floor instead: suction under the slab, with the floor-wall joint, accessible cracks, and any sectioned-pour seams closed so the fan's effort goes into the soil rather than into pulling room air. The old floors are the real variable. Many were poured thin, in stages, years after the walls went up, and a communication test often shows two or three separate pressure zones where a newer house would have one, which is what justifies a second suction point in the quote. A coal-cellar room or dirt-floored corner gets brought into the design with a membrane or a seal-and-slab scope. Verification matters most on exactly these houses, so the retest is not optional paperwork; it is the proof the design worked. Our post on stone foundations in Pittsburgh walks through a typical scope.