FAQ

We close in two weeks and the radon test came back high. Is there time?

Direct answer

Usually, yes. A typical install is one day, and verification needs 48 hours of testing that can start about a day after the fan runs. The scarce resources are the survey visit and signed paperwork, so the first call matters most.

More detail

Work the calendar backward. Closing day minus a buffer for the lender's file gives the verification report deadline; the report needs a test of at least 48 hours; the test can begin roughly 24 hours after the system starts; the install itself takes a day for most single-suction scopes; and in front of all of it sits the foundation survey that produces the fixed written quote both parties and both agents need to sign off on. Added up, a clean sequence fits in eight to ten days, which means two weeks is workable and ten days is tight but real. What compresses the timeline: having the test report, foundation details, sump and crawl situation, and the transaction deadlines all in the first phone call, so the survey books immediately and the scope writes itself. What blows the timeline: a week of quote-shopping before anyone measures anything. Weather can nudge the retest in a stormy stretch, so a day of slack is worth protecting. Say the words "closing date" when you contact us and the schedule gets built from that date first.

Authoritative sources

Ready to get started?

Stone foundations, hillside walkouts, coal cellars, and new Cranberry builds each get a design, not a template. Mon-Sat 8am-7pm.

Call (412) 213-6297Text us

Prefer to text? Open your texting app